[§II]
Services

Six capabilities.
One operating system for autonomous work.

Every engagement runs the same model: Lenny at the center, Niko shipping code, Mira writing the spec, Nova running QA. The shape of the engagement changes — the discipline doesn't.

[01]build

Feature Development

Ship product features, bug fixes, or new surfaces using the agentic dev team. You define the outcomes — stories, acceptance criteria, and delivery are handled end to end. Every PR is scoped, tested, and reviewed before it touches your codebase.

Deliverables
  • Requirements + acceptance criteria (Mira)
  • Clean, tested implementation (Niko)
  • UI/UX implementation (Nova)
  • Senior review at every merge checkpoint
Typical timeline · 2–6 weeks per sprint
[02]embed

Staff Augmentation

Lenny joins your team as a senior developer — and brings the agents with him. Your team gets a senior contributor who ships at team velocity, integrates with your tools, and brings no management overhead. The agent team is included.

Deliverables
  • Senior-level technical judgment
  • Agent team operating in your stack
  • Integration with your existing workflow
  • Weekly syncs, async by default
Typical timeline · monthly retainer, rolling
[03]ship

MVP Build

Take an idea from design to production in weeks, not months. The full agentic team — architecture, implementation, QA, and UI — running in parallel. When it ships, you own it completely: code, infrastructure, process.

Deliverables
  • Architecture + technical foundation
  • Full-stack implementation (Niko + Nova)
  • QA, test coverage, and CI setup (Nova)
  • Production deployment + handoff docs
Typical timeline · 6–12 weeks
[04]transform

Agentic Team Setup

Stand up the agentic dev team model at your organization, then exit when it runs. Design the agent roles, configure the infrastructure, run the first sprint alongside your team, and hand off a working system. The exit is a feature — we're not incentivized to stay.

Deliverables
  • Agent role design + tooling setup
  • Infrastructure configuration (local or cloud)
  • First full sprint run alongside your team
  • Handoff: docs, runbooks, and operating model
Typical timeline · 4–8 weeks
[§III]
Engagement

Three shapes of engagement.
Pick the one that fits the risk.

α2–4 weeks

Sprint

A focused build — one feature set, one surface, one sprint. Fast to scope, fast to ship. Low commitment, real output.

β6–12 weeks

Engagement

A full feature set or MVP. Architecture to deployment, with evals baked in at every step. You own the codebase at handoff.

Ωmonthly retainer

Embedded

Lenny and the agents on your team, ongoing. Senior velocity, no management overhead, cancel any time.

[§IV]_Next

Have a feature that should already be shipped?

Start_a_conversation